Customization: | Available |
---|---|
After-sales Service: | Installation Guidance on Construction Site |
Connection Form: | Bolt Connection |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Prefabricated Metal Buildings Construction / Prefab Workshop Buildings
Prefabricated Metal Buildings Construction / Prefab Workshop Buildings . This is a heavy industrial steel workshop for mechanical and electrical products. We design the proposal and drawing, fabrication for the steel structure components, installation for the steel structure, overhead crane, roof and wall insulation panel for this project.
The structre type of this steel wrokshop buildings is portal frame and a single-layer steel structure with rigid connection of beams and columns. It has the characteristics of simple structure, light weight, reasonable force and convenient construction, and is convenient for factory and standardized processing.
Name |
Prefabricated Metal Buildings Construction / Prefab Workshop Buildings |
Structure Type | portal frame, single ridge, multi spans |
Length | 200m |
Width | 90m |
Eave Height | 15m |
Roof Slope | 10% |
Gable Wall Column Spacing | 7.5m |
Roof |
75 mm thick Rock wool sandwich panel |
Wall | 75 mm thick Rock wool sandwich panel |
Door | Sliding door |
Window | Ribbon Skylight |
Height difference between indoor and outdoor | 300mm |
1.
QC/Technical Support
Raw material quality control
Thickness tolerance <0.25mm
Yield and tension strength testing in-house
Third party inspection certificate
Supply traceable mill certificate
Structural steel fabrication quality control
100% testing dimension tolerance <1mm
20% sample welding line ultrasonic testing, no fault, full penetration.
20% magnetic powder testing, no bubble, no defect, Smooth and Full
Supply third-party inspection assistance.
Shot blasting and painting quality control
Shot blasting grade Sa. 2.5 Metal luster, no rust, no oil dirt, no welding spatter, Roughness >75um
Paint primer within 5 hours after shot blasting, Holiday-free coatings, smooth, No dust, Dry Film Thickness (DFT) >75UM
Pre-assembly testing the connection details.
1. You are manufacture factory or trading company?
1. Professional design team, we could design the drawing as your requirement or calculate the steel quantity based on your drawing.
2. Skilled fabrication team and advanced equipment. We make the independent production schedule to each project.
3. One-stop service: We have completed lots such kinds of projects, we could provide the integrated proposal for your project.
4. Professional QC team will guarantee that we will provide the production and service as your request.
5. After sales service: If it has any questions that need us to do in your process of using, such as the maintain of outside insulation and steel components, just tell us , we will try to provide the service as well as we can.