Customization: | Available |
---|---|
Connection Form: | Bolt Connection |
Raw Steel Material: | Q235B, Q355b, ASTM A36 |
Still deciding? Get samples of US$ 1/Square Meter
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Industrial Steel Building Construction / Prefab Steel Building Frame Workshop
This is a modern industrial steel structure workshop as a textile production factory. It has three span, the length of each span reaches 50m. It is hard for a concrete building that could such large length of span and inside space. The steel structure frame building has light weight, reduces the basic cost, and has a fast construction speed. It can be completed and put into operation as soon as possible, and the comprehensive economic benefits are much better than the concrete structure.
Steel Frame | H section steel | Q235/Q345 steel 8mm/10mm |
Welding | Automatic submerged arc welding | |
Rust removal | Sand blasting | |
Surface finish | Alkyd paint or galvanized | |
Intensive bolt | M20,Grade 10.9 | |
Supporting System | Angle brace | L50x4,Steel Q235, processed and painted |
Horizontal brace | Φ20, Steel Q235, processed and painted | |
Column brance | Φ20, Steel Q235, processed and painted | |
Tie rod | Φ89*3, Steel Q235, processed and painted | |
Ordinary bolt | M12 Galvanized bolt | |
Roof | Purlin | C160*60*2.5,Steel Q235, galvanized and painted |
Roof panel | 75mm Glass wool sandwich panel | |
Sky light | 6mm thick PVC | |
Accessories | Glass cement, self-tapping screws, etc. | |
Edge cover | 0.4mm steel sheet profile trimming | |
Gutter | 0.4mm thick sheet steel profile or galvanized sheet | |
Down pie | Φ110PVC | |
Walls | Purlin | C160*60*2.5,Steel Q235, painted |
Wall | 75mm Glass wool sandwich panel | |
Accessories | Glass cement, self-tapping screws, etc. | |
Edge cover | 0.4mm steel sheet profile trimming | |
Ventilation | Ventilation ball | |
Doors & windows | Rolling door/sliding door PVC/alu/steel/window |
1.
QC/Technical Support
Raw material quality control
Thickness tolerance <0.25mm
Yield and tension strength testing in-house
Third party inspection certificate
Supply traceable mill certificate
Structural steel fabrication quality control
100% testing dimension tolerance <1mm
20% sample welding line ultrasonic testing, no fault, full penetration.
20% magnetic powder testing, no bubble, no defect, Smooth and Full
Supply third-party inspection assistance.
Shot blasting and painting quality control
Shot blasting grade Sa. 2.5 Metal luster, no rust, no oil dirt, no welding spatter, Roughness >75um
Paint primer within 5 hours after shot blasting, Holiday-free coatings, smooth, No dust, Dry Film Thickness (DFT) >75UM
Pre-assembly testing the connection details.
1. You are manufacture factory or trading company?
1. Professional design team, we could design the drawing as your requirement or calculate the steel quantity based on your drawing.
2. Skilled fabrication team and advanced equipment. We make the independent production schedule to each project.
3. One-stop service: We have completed lots such kinds of projects, we could provide the integrated proposal for your project.
4. Professional QC team will guarantee that we will provide the production and service as your request.
5. After sales service: If it has any questions that need us to do in your process of using, such as the maintain of outside insulation and steel components, just tell us , we will try to provide the service as well as we can.