Customization: | Available |
---|---|
After-sales Service: | Installation Guidance on Construction Site |
Standard: | GB, ASTM, JIS, DIN, AISI, BS, Ipe |
Still deciding? Get samples of US$ 1/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Single/Double/Multi Slope Roof Design Easy Mainenance Prefabricated Steel Structure Workshop Shed
Steel structural components are typically treated with either galvanization or painting to provide protection and aesthetic appeal. Galvanization involves immersing the steel parts in molten zinc to form a zinc coating.
Galvanization offers excellent corrosion resistance, effectively preventing oxidation and corrosion. Additionally, the galvanized surface is hard and abrasion-resistant, capable of withstanding scratches and wear.
However, galvanization also has some drawbacks. Firstly, the galvanization process is relatively complex and requires specialized equipment and expertise, increasing manufacturing costs. Secondly, the galvanized surface may exhibit uneven color or texture, affecting the appearance. Furthermore, the galvanized layer may corrode over prolonged use or under severe abrasion.
In comparison, painting involves applying paint coatings onto the surface of steel structural components. Painting offers a wide range of color choices and finishes, allowing for more personalized designs. Additionally, painting provides additional corrosion protection, preventing direct contact between the steel parts and the external environment.
However, painting also has some disadvantages. Firstly, the durability of paint coatings is generally inferior to galvanization, requiring regular maintenance and repainting to maintain appearance and protection. Secondly, the painting process is more complex, requiring time and labor-intensive efforts. Furthermore, painting costs are relatively higher and may increase the overall project expenses.
Company Overview: |
Our steel structure fabricaiton factory: |
Installation: |
Method 1: We provide shop drawing before installation.
Method 2: If you still don't know how to install, We will teach you the installation in our factory. when necessary , we will assemble a sample steel structure building for you.
Quality Control: |
Packing & Loading: |
All the structure components, panels,bolts and sort of accessories will bewell packed with standard package suitable ocean transportation and loaded into 40'HQ.
All the products are loaded at the loading site of our factory using crane and forklift by our skilled workers,who will prevent the goods to be damaged.
Why us? |
1. Professional design team, we could design the drawing as your requirement or calculate the steel quantity based on your drawing.
2. Skilled fabrication team and advanced equipment. We make the independent production schedule to each project.
3. One-stop service: We have completed lots such kinds of projects, we could provide the integrated proposal for your project.
4. Professional QC team will guarantee that we will provide the production and service as your request.
5. After sales service: If it has any questions that need us to do in your process of using, such as the maintain of outside insulation and steel components, just tell us , we will try to provide the service as well as we can.
How to quote: |
1 | Location (where will it be built?) | _____country, area |
2 | Size: length*width*height | _____mm*_____mm*_____mm |
3 | wind load (max. wind speed) | _____kn/m2, _____km/h, _____m/s |
4 | snow load (max. snow height) | _____kn/m2, _____mm |
5 | anti-earthquake | _____level |
6 | brickwall needed or not | If yes, 1.2m high or 1.5m high |
7 | thermal insulation | If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; . if not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former |
8 | door quantity & size | _____units, _____(width)mm*_____(height)mm |
9 | window quanity & size | _____units, _____(width)mm*_____(height)mm |
10 | crane needed or not | If yes, _____units, max. lifting weight____tons; max. lifting height _____m |