Customization: | Available |
---|---|
After-sales Service: | Installation Guidance on Construction Site |
Connection Form: | Bolt Connection |
Still deciding? Get samples of US$ 1/Square Meter
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Pre Engineered Metal Workshop Building With Overhead Crane / Prefab Metal Workshop
Pre Engineered Metal Workshop Building With Overhead Crane / Prefab Metal Workshop. This is a Pre engineered Metal Workshop Building Builders With Overhead Crane for Maersk. It is used as a mechanical maintenance workshop for Maersk. It has one 20T electric single girder crane and two 5T electric single girder cranes inside. Roof and wall panel is Rock wool composite panel. We designed the drawing, fabricated all the steel structure components in our factory, installed the steel structure and crane , wall and roof panel for Maersk.
As Maersk has very strict quality requirement for the welded steel structure, they ask for SGS to carry out the Third-party Inspection. We coordinate SGS for Inspection for the welding and painting quality of steel structure in our factory and successfully passed the inspection.
Steel frame structure bulidings has Light weight, high strength, large span, simple construction, short construction period: all components are prefabricated in the factory, the site is simply assembled, thus greatly shortening the construction period, a 6000 square meters of buildings, only 40 days to complete the basic installation.Beautiful and practical: the steel structure building line is simple and smooth, has the modern feeling.Color wall panels are available in a variety of colors, and other materials can be used for the wall, so it is more flexible.Reasonable cost: the steel structure building is light in weight, which reduces the basic cost, and the construction speed is fast, which can be completed and put into production as soon as possible. The comprehensive economic benefit is much better than the concrete structure building.
Main Steel Frame System | |
Main structure |
H section steel Q355, alkyd painting, two primary painting, two finish painting. |
Roof purlin | XZ160*60*20*2.5, galvanized |
Wall purlin | XZ160*60*20*2.5, galvanized |
Intensive bolt | Grade 10.9 |
Turn buckle bolt | M20+2, steel Q235, processing |
Anchor bolt | M24, steel Q235, processing |
Ordinary bolt | Galvanized bolt M20 |
Ordinary bolt | Galvanized bolt M12 |
Brace nut | Galvanized bolt M12 |
Bracing System | |
Cross brace | Φ20 round steel bar Q235, process and painted (alkyd painting) |
Angle brace | L50*5 angle steel Q235, process and painted (alkyd painting) |
Column bracing | Φ25 round steel bar Q235, process and painted (alkyd painting) |
Tie bar | Φ127*3 steel pipe Q235, process and painted (alkyd painting) |
Batter brace | Φ32*2.5, Φ12 round steel bar Q235, process and painted (alkyd painting) |
Wall & Roof System | |
Roof panel | Corrugated steel plate or sandwich panel (EPS/fiber glass/rock wool/PU) |
Wall panel | Corrugated steel plate or sandwich panel (EPS/fiber glass/rock wool/PU) |
Edge cover | 0.5mm color plate, angle Alu. |
Fittings & accessories | Nails, glue etc. |
Unpowered ventilator | Diameter Φ600, stainless steel |
Sky lighting band | 1.2mm FRP, double layer |
Sliding door | sandwich panel door |
Roof drainage system | |
Gutter | 0.5mm color steel plate |
Rainspout pipes | Φ110 PVC pipe |
1.
QC/Technical Support
Raw material quality control
Thickness tolerance <0.25mm
Yield and tension strength testing in-house
Third party inspection certificate
Supply traceable mill certificate
Structural steel fabrication quality control
100% testing dimension tolerance <1mm
20% sample welding line ultrasonic testing, no fault, full penetration.
20% magnetic powder testing, no bubble, no defect, Smooth and Full
Supply third-party inspection assistance.
Shot blasting and painting quality control
Shot blasting grade Sa. 2.5 Metal luster, no rust, no oil dirt, no welding spatter, Roughness >75um
Paint primer within 5 hours after shot blasting, Holiday-free coatings, smooth, No dust, Dry Film Thickness (DFT) >75UM
Pre-assembly testing the connection details.
1. You are manufacture factory or trading company?
1. Professional design team, we could design the drawing as your requirement or calculate the steel quantity based on your drawing.
2. Skilled fabrication team and advanced equipment. We make the independent production schedule to each project.
3. One-stop service: We have completed lots such kinds of projects, we could provide the integrated proposal for your project.
4. Professional QC team will guarantee that we will provide the production and service as your request.
5. After sales service: If it has any questions that need us to do in your process of using, such as the maintain of outside insulation and steel components, just tell us , we will try to provide the service as well as we can.