Customization: | Available |
---|---|
After-sales Service: | Installation Guidance on Construction Site |
Connection Form: | Bolt Connection |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Pre Engineered Metal Workshop Building With Overhead Crane / Prefab Metal Workshop
This is a Pre engineered Metal Workshop Building Builders With Overhead Crane for Maersk. It is used as a mechanical maintenance workshop for Maersk. It has one 20T electric single girder crane and two 5T electric single girder cranes inside. Roof and wall panel is Rock wool composite panel. We designed the drawing, fabricated all the steel structure components in our factory, installed the steel structure and crane , wall and roof panel for Maersk.
As Maersk has very strict quality requirement for the welded steel structure, they ask for SGS to carry out the Third-party Inspection. We coordinate SGS for Inspection for the welding and painting quality of steel structure in our factory and successfully passed the inspection.
Steel frame structure bulidings has Light weight, high strength, large span, simple construction, short construction period: all components are prefabricated in the factory, the site is simply assembled, thus greatly shortening the construction period, a 6000 square meters of buildings, only 40 days to complete the basic installation.Beautiful and practical: the steel structure building line is simple and smooth, has the modern feeling.Color wall panels are available in a variety of colors, and other materials can be used for the wall, so it is more flexible.Reasonable cost: the steel structure building is light in weight, which reduces the basic cost, and the construction speed is fast, which can be completed and put into production as soon as possible. The comprehensive economic benefit is much better than the concrete structure building.
Material List
Name | Pre Engineered Metal Workshop Building With Overhead Crane / Prefab Metal Workshop |
Structure Type | portal frame, single ridge, three spans |
Length | 110m |
Width | 60m |
Eave Height | 12m |
Roof Slope | 10% |
Gable Wall Column Spacing | 7.5m |
Roof |
75 mm thick Rock wool sandwich panel |
Wall | 75 mm thick Rock wool sandwich panel |
Door | Sliding door |
Window | Ribbon Skylight |
Height difference between indoor and outdoor | 300mm |
Project Show
Our Company
Qingdao Ruly Steel Engineering Co., Ltd is a professional steel structure fabrication and engineering company, located in Qingdao, China, which integrates steel structure design, research and development, manufacturing and installation. The project types include prefabricated steel workshop, warehouse, logistics park and other light steel structure of the civil building system, high-rise residential buildings, exhibition center, stadium, airport station and bridge, Power plant, chemical plant, oil and gas, mining,etc.
Our company's steel structure processing plant now covers an area of 35,000 square meters, plant20,000 square meters. More than 100 employees. The monthly production capacity for steel structure is more than 1500 Tons. Our steel structure components include light/heavy H steel ,BOX steel,Cross shaped section steel, large diameter submerged arc straight-weld pipe,steel model structure, C/Z purlin and machining fitting components . There are three subordinate steel structure companies, which have passed and strictly implemented ISO9001:2008 quality management system, ISO14001:2004 environmental system, GB/T28001:2001 occupational health system, and obtained ASTM certification in the United States, and international SGS product certification. Obtained the right of export, design, installation and consultation from the ministry of foreign trade and economic cooperation.
Quality first, Technology ahead ,Innovation continually is our entrepreneurial concept. We build strong relationships of trust with our clients, truly understanding their needs and bringing them the most reasonable solutions.
Certificate
Our Service
QC/Technical Support
Raw material quality control
Thickness tolerance <0.25mm
Yield and tension strength testing in-house
Third party inspection certificate
Supply traceable mill certificate
Structural steel fabrication quality control
100% testing dimension tolerance <1mm
20% sample welding line ultrasonic testing, no fault, full penetration.
20% magnetic powder testing, no bubble, no defect, Smooth and Full
Supply third-party inspection assistance.
Shot blasting and painting quality control
Shot blasting grade Sa. 2.5 Metal luster, no rust, no oil dirt, no welding spatter, Roughness >75um
Paint primer within 5 hours after shot blasting, Holiday-free coatings, smooth, No dust, Dry Film Thickness (DFT) >75UM
Pre-assembly testing the connection details.
Design:
For such project , we will design the preliminary layout drawing, 3D Tekla model and installation drawing to contribute to the completion of the project.
Component
Thanks for watching