Customization: | Available |
---|---|
Connection Form: | Bolt Connection |
Raw Steel Material: | Q235B, Q355b, ASTM A36 |
Still deciding? Get samples of US$ 1/Square Meter
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Fast Assemble Prefabricated Steel Structure Building Frame House for Prefab Metal Warehouse Workshop Storage Apartment Hotel Hospital Metal
In the calculation process, it is considered that the load acts on the plane of the vertical symmetry axis of the steel beam section, that is, the maximum stiffness plane, so the bending deformation along the longitudinal axis can be generated.
Single actually load may not accurately known as used in vertical plane of girder, at the same time, inevitably there will be a variety of causal factors and the transverse effect, so the steel beam not only can produce vertical deformation, inevitably there are all sorts of accidental factors produced by the transverse force, so steel beams in the process of installation and use, not only can produce along the longitudinal axis of the vertical deformation, also have a variety of causal factors of lateral horizontal displacement.
However, the horizontal displacement of the steel beam of the steel structure is generally not large, but due to the huge difference in the rigidity of the steel beam in the two directions, although the displacement on the horizontal axis is small, the influence is great, because the steel may appear distorted deformation due to the horizontal displacement before reaching the yield strength.
In the design and processing of steel structure, the instability of steel structure should be taken into account
Material List
No. | Item | Prefabricated Construction Design Steel Structure Logistics Warehouse | |
1 | Material | Material | H-section steel beam&column |
2 | Produce | Lead time | Normallly 45days after down payment, also according to quantity. |
3 | Quality | Certification | Quality certificate from factory, the third party by client request. |
4 | Dimensions | Length | H beam: 4000-15000mm |
5 | Thickness: | web plate: 6-32mm | |
6 | wing plate: 6-40mm | ||
7 | Height | 200-1200mm | |
8 | Color | According to customers | |
9 | Size | MOQ is 1000 m2, width * length * eave height, | |
10 | Main components | Base | Cement and steel foundation bolts |
11 | Main frame | H Steel beam, Q235 Q355 steel H beam and columns, painted or galvanized, box steel, galvanized C section or steel pipe | |
12 | Secondary frame : | galvanized C or Z purlin , steel bracing , tie bar , knee brace ,flashing etc. | |
13 | Material | Q235B, Q355B or others as buyers' requests, like: ASTM, BSEN, DIN, IPE,AISI,JIS, | |
14 | Purlin | C or Z purlin: Size from C120~C320, Z100~Z20 | |
15 | Column | X-type, tree type ,lattice, Cross, Box etc. | |
16 | Bolt | Plain bolt and High-strength bolt | |
17 | Roof & wall | PU sandwich panel, Rockwool sandwich panel or Corrugated steel sheet | |
18 | Canopy | steel sheet, PU sandwich panel, Rockwool sandwich panel | |
19 | Door | Sliding or rolling door | |
20 | Window | Aluminium alloy window | |
21 | Surface | Two lays of rust-proof painting or Hot Dip Galvanized | |
22 | Sheet | 0.5mm or 0.6mm galvanized sheet | |
23 | Accessories | Semi-transparent skylight belts, Ventilators,down pipe, Galvanized gutter, Trim, flashing, etc | |
24 | Finishing options | Vast array of colors and textures available, Alkyd painting, two primary painting, two finish painting (gray paint, red paint, white paint, epoxy zinc etc.). Or Galvanized. | |
25 | Usages | 1. Steel workshop, steel warehouse, steel structure plant | |
26 | 2. Steel web frame structure | ||
27 | 3. Steel H-column and steel H-beam | ||
28 | 4. Portal frame products | ||
29 | 5. High rise building project | ||
30 | 6. Others steel structure buildings |
Project Show
Our Company factory
Qingdao Ruly Steel Engineering Co., Ltd is a professional steel structure fabrication and engineering company, located in Qingdao, China, which integrates steel structure design, research and development, manufacturing and installation. The project types include prefabricated steel workshop, warehouse, logistics park and other light steel structure of the civil building system, high-rise residential buildings, exhibition center, stadium, airport station and bridge, Power plant, chemical plant, oil and gas, mining,etc.
Our company's steel structure processing plant now covers an area of 35,000 square meters, plant20,000 square meters. More than 100 employees. The monthly production capacity for steel structure is more than 1500 Tons. Our steel structure components include light/heavy H steel ,BOX steel,Cross shaped section steel, large diameter submerged arc straight-weld pipe,steel model structure, C/Z purlin and machining fitting components . There are three subordinate steel structure companies, which have passed and strictly implemented ISO9001:2008 quality management system, ISO14001:2004 environmental system, GB/T28001:2001 occupational health system, and obtained ASTM certification in the United States, and international SGS product certification. Obtained the right of export, design, installation and consultation from the ministry of foreign trade and economic cooperation.
Quality first, Technology ahead ,Innovation continually is our entrepreneurial concept. We build strong relationships of trust with our clients, truly understanding their needs and bringing them the most reasonable solutions.
Certificate
Our Service
QC/Technical Support
Raw material quality control
Thickness tolerance <0.25mm
Yield and tension strength testing in-house
Third party inspection certificate
Supply traceable mill certificate
Structural steel fabrication quality control
100% testing dimension tolerance <1mm
20% sample welding line ultrasonic testing, no fault, full penetration.
20% magnetic powder testing, no bubble, no defect, Smooth and Full
Supply third-party inspection assistance.
Shot blasting and painting quality control
Shot blasting grade Sa. 2.5 Metal luster, no rust, no oil dirt, no welding spatter, Roughness >75um
Paint primer within 5 hours after shot blasting, Holiday-free coatings, smooth, No dust, Dry Film Thickness (DFT) >75UM
Pre-assembly testing the connection details.
Design:
For such project , we will design the preliminary layout drawing, 3D Tekla model and installation drawing to contribute to the completion of the project.
Component