Customization: | Available |
---|---|
After-sales Service: | Installation Guidance on Construction Site |
Connection Form: | Bolt Connection |
Still deciding? Get samples of US$ 1/Square Meter
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
High Rise Buildings Steel Structure Construction / Multi Floors Metal Residence Buildings
Steel Structure High Rise Buildings / Multi Floors Metal Residence Buildings. This is a six floors steel frame structure residence buildings. Welded H-section steel beams and columns are connected by high strength bolts to compose the main frame structure.
Glavanized steel floor deck is used to be the floor base support. For pre-assembled steel components, to guarantee it complying with the design requirements and quality standards, all the steel structure are fabricated in our factory. We also consider the deformation values such as weld shrinkage allowance of the length dimension of the column, beam, support and other components.
Qingdao Ruly Steel Engineering Co.,Ltd is a professional steel structure fabrication and construction company for light and heavy steel structure project. Our service include design, fabrication for all the steel structure components and insullation panel, installation on site.
1 | Steel structural material has high strength and light weight | The steel structure has high strength. Compared with the concrete structure, the steel structure beam and the column cross-sectional area are small, which can increase the effective use area. Generally, the cross-sectional area of the high-rise steel structure column accounts for about 3% of the building area, and the cross-sectional area of the high-rise concrete structure accounts for 7%-9% of the building area. |
2 | Steel structure construction speed is fast | Most of the steel structure is produced in the factory and transported to the site for integral assembly by welding or bolting. It can be used all day, because the steel structure itself can be used as a load-bearing structure for the construction load to reduce the formwork during construction, thus not only reducing costs, but also greatly speeding up Construction speed. The construction speed of the steel structure is about 1.5 times that of the concrete structure. |
3 | Convenient pipeline layout | In the structural space of the steel structure, the truss type member or the member having the cavity can be used, so that the arrangement of the pipeline is convenient, and the replacement and repair of the pipeline is convenient. However, if a concrete structure is used, the beam should not be opened, and the pipe generally passes under the beam, thereby occupying a certain space. In the case of the same floor height, the floor height of the steel structure can be smaller than the floor height of the concrete structure, which can reduce the area of the outer wall. |
4 | The steel construction environment is less polluted | When steel structure is constructed, sand, stone, soil, cement and other materials are rarely used, and pollution problems such as dust flying, waste accumulation and noise are avoided from the root wood. |
5 | Steel structure construction conforms to sustainable development policy | The steel structure industry is a green-bag environmental protection construction industry. Its utilization of resources and energy is relatively reasonable, and has little damage to the environment.. |
1.
QC/Technical Support
Raw material quality control
Thickness tolerance <0.25mm
Yield and tension strength testing in-house
Third party inspection certificate
Supply traceable mill certificate
Structural steel fabrication quality control
100% testing dimension tolerance <1mm
20% sample welding line ultrasonic testing, no fault, full penetration.
20% magnetic powder testing, no bubble, no defect, Smooth and Full
Supply third-party inspection assistance.
Shot blasting and painting quality control
Shot blasting grade Sa. 2.5 Metal luster, no rust, no oil dirt, no welding spatter, Roughness >75um
Paint primer within 5 hours after shot blasting, Holiday-free coatings, smooth, No dust, Dry Film Thickness (DFT) >75UM
Pre-assembly testing the connection details.
1. You are manufacture factory or trading company?
1. Professional design team, we could design the drawing as your requirement or calculate the steel quantity based on your drawing.
2. Skilled fabrication team and advanced equipment. We make the independent production schedule to each project.
3. One-stop service: We have completed lots such kinds of projects, we could provide the integrated proposal for your project.
4. Professional QC team will guarantee that we will provide the production and service as your request.
5. After sales service: If it has any questions that need us to do in your process of using, such as the maintain of outside insulation and steel components, just tell us , we will try to provide the service as well as we can.