Customization: | Available |
---|---|
Connection Form: | Bolt Connection |
Raw Steel Material: | Q235B, Q355b, ASTM A36 |
Still deciding? Get samples of US$ 1/Square Meter
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Customized Prefabricated Hot Dip Galvanized Steel Frame Buildings
1, The cost is much lower than that of concrete structures, and our steel structure has a high repurchase rate.
2, Prefabricated building, the workload is small, the customer only needs to use bolts to assemble the components, and the construction speed is fast.
3, The structure is firm and the ductility is good. It is designed according to the load and can be designed to have anti-seismic and wind-resistant properties.
1. The tensile strength of steel is much more times greater than concrete.
2. Steel is also ductile in nature.
3. Steel has also the high strength to weight ratio as compared to concrete.
4. Steel structures are also preferred when time span is small. Construction rate is very fast.
5. Steel bars are also reusable.
6. Steel structures can be extended in any direction.
Qingdao Ruly Steel Engineering Co.,Ltd is a professional steel structure fabrication and construction company for light and heavy steel structure project. Our service include design, fabrication for all the steel structure components and insullation panel, installation on site.
No. | Item | Details of steel structure building or steel frame | |
1 | Material | Material | carbon structural steel |
2 | Produce | Lead time | Normallly 45days after down payment, also according to quantity. |
3 | Quality | Certification | Quality certificate from factory, the third party by client request. |
4 | Dimensions | Length | H beam: 4000-15000mm |
5 | Thickness: | web plate: 6-32mm | |
6 | wing plate: 6-40mm | ||
7 | Height | 200-1200mm | |
8 | Color | According to customers | |
9 | Size | MOQ is 1000 m2, width * length * eave height, | |
10 | Main components | Base | Cement and steel foundation bolts |
11 | Main frame | H Steel beam, Q235 Q345 steel H beam and columns, painted or galvanized, box steel, galvanized C section or steel pipe | |
12 | Secondary frame : | galvanized C or Z purlin , steel bracing , tie bar , knee brace ,flashing etc. | |
13 | Material | Q235B, Q345B or others as buyers' requests, like: ASTM, BSEN, DIN, IPE,AISI,JIS, | |
14 | Purlin | C or Z purlin: Size from C120~C320, Z100~Z20 | |
15 | Column | X-type, tree type ,lattice, Cross, Box etc. | |
16 | Bolt | Plain bolt and High-strength bolt | |
17 | Roof & wall | PU sandwich panel, Rockwool sandwich panel or Corrugated steel sheet | |
18 | Canopy | steel sheet, PU sandwich panel, Rockwool sandwich panel | |
19 | Door | Sliding or rolling door | |
20 | Window | Aluminium alloy window | |
21 | Surface | Two lays of rust-proof painting or Hot Dip Galvanized | |
22 | Sheet | 0.5mm or 0.6mm galvanized sheet | |
23 | Accessories | Semi-transparent skylight belts, Ventilators,down pipe, Galvanized gutter, Trim, flashing, etc | |
24 | Finishing options | Vast array of colors and textures available, Alkyd painting, two primary painting, two finish painting (gray paint, red paint, white paint, epoxy zinc etc.). Or Galvanized. | |
25 | Usages | 1. Steel workshop, steel warehouse, steel structure plant | |
26 | 2. Steel web frame structure | ||
27 | 3. Steel H-column and steel H-beam | ||
28 | 4. Portal frame products | ||
29 | 5. High rise building project | ||
30 | 6. Others steel structure buildings |
Service Life | 50-70years | Standard | AISI, ASTM, BS, DIN,JIS |
Place of Origin | Qingdao,Shandong,China | Material | steel and sandwich panel |
Grade | Q235B, Q355B or as per customer's need | Application | workshop, warehouse, poultry house,garage etc. |
Connection | intensive bolt, ordinary bolt | Bolt Grade | M20, M16, M14 etc. |
Downsput | PVC pipe or as per customer's request | Window | PVC steel or aluminum alloy |
Purlin | C/Z shape profile | Door | sliding or rolling door |
Main Frame | welded or hot rolled H section steel, colum and beam | Panel | EPS/PU/fiber glass/rock wool |
Delivery | 30-40days | Payment |
TT,LC
|
1. PVC Polymerization device industrial plant Project:
We design the 3D model for the steel frame structure of the building. Then we fabricate the steel components about 600 tons and install it together with the General contractor.QC/Technical Support
Raw material quality control
Thickness tolerance <0.25mm
Yield and tension strength testing in-house
Third party inspection certificate
Supply traceable mill certificate
Structural steel fabrication quality control
100% testing dimension tolerance <1mm
20% sample welding line ultrasonic testing, no fault, full penetration.
20% magnetic powder testing, no bubble, no defect, Smooth and Full
Supply third-party inspection assistance.
Shot blasting and painting quality control
Shot blasting grade Sa. 2.5 Metal luster, no rust, no oil dirt, no welding spatter, Roughness >75um
Paint primer within 5 hours after shot blasting, Holiday-free coatings, smooth, No dust, Dry Film Thickness (DFT) >75UM
Pre-assembly testing the connection details.
1. You are manufacture factory or trading company?
1. Professional design team, we could design the drawing as your requirement or calculate the steel quantity based on your drawing.
2. Skilled fabrication team and advanced equipment. We make the independent production schedule to each project.
3. One-stop service: We have completed lots such kinds of projects, we could provide the integrated proposal for your project.
4. Professional QC team will guarantee that we will provide the production and service as your request.
5. After sales service: If it has any questions that need us to do in your process of using, such as the maintain of outside insulation and steel components, just tell us , we will try to provide the service as well as we can.