Engineer Guidance on Site Installation Construction Warehouse Steel Structure Building

Product Details
Customization: Available
After-sales Service: Installation Guidance on Construction Site
Connection Form: Bolt Connection
Still deciding? Get samples of US$ 0/Square Meter
Request Sample
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
63
Year of Establishment
2019-02-02
  • Engineer Guidance on Site Installation Construction Warehouse Steel Structure Building
  • Engineer Guidance on Site Installation Construction Warehouse Steel Structure Building
  • Engineer Guidance on Site Installation Construction Warehouse Steel Structure Building
  • Engineer Guidance on Site Installation Construction Warehouse Steel Structure Building
  • Engineer Guidance on Site Installation Construction Warehouse Steel Structure Building
  • Engineer Guidance on Site Installation Construction Warehouse Steel Structure Building
Find Similar Products

Basic Info.

Model NO.
RULYXU1275
Grade
Low-Alloy High-Tensile Structural Steel
Molding Method
Hot-Rolled Steel
Residential Wall Structure
Single Layer Cladding Sheet/Sandwich Panel
Standard
CE, Aisc, SGS, BV, ISO, GB
Steel Type
H-Section Steel
Structure
Steel Structure
Surface Treatment
Painting or Hot-DIP Galvanized
Drawing
CAD, Tekla, 3D Model, Pkpm, Bim
Installation
Engineer Guidance on Site
Service Life
50 Years
Size
Customized
Features
Prefab Steel Structure
Raw Steel Material
Q235B, Q355b, ASTM A36
Wall Cladding
Corrugated Steel Sheet or Sandwich Panel
Application
Steel Workshop, Steel Structure Platform
Drawing: Design
The Drawing as Your Demand
Certification
CE, Aisc, SGS, BV, ISO, GB
Usage
Steel Structure Construction
Parapet Wall
as Requested
Warranty
According to Project Type
Color
Customized
Transport Package
Seaworthy
Specification
Square meter
Trademark
Ruly Steel
Origin
Qingdao, China
HS Code
9406900090
Production Capacity
20000 Square Meter Per Month

Product Description

Prefab Warehouse Steel Structure Building Steel Shed Cheap Prefabricated Workshop


Product Description 

Steel structure plant features: 

1. steel structure building light weight, high strength, large span. 

2. steel structure construction period is short, reduce the investment cost accordingly. 

3. steel structure building fire resistance is poor, corrosion resistance, low temperature areas should not use steel structure. 

4. steel structure building is easy to move, recycling pollution-free.
 

Engineer Guidance on Site Installation Construction Warehouse Steel Structure Building
Engineer Guidance on Site Installation Construction Warehouse Steel Structure Building


Material list 

Engineer Guidance on Site Installation Construction Warehouse Steel Structure Building
 
Steel Frame H section steel Q235steel plate thickness: 8-30mm
Welding Automatic submerged arc welding
Rust removal Sand blasting
Surface finish Alkyd paint or galvanized
Intensive bolt M20,Grade 10.9
Supporting System Angle brace L50x4,Steel Q235, processed and painted
Horizontal brace Φ20, Steel Q235, processed and painted
Column brance Φ20, Steel Q235, processed and painted
Tie rod Φ89*3, Steel Q235, processed and painted
Ordinary bolt M12 Galvanized bolt
Roof Purlin C160*60*2.5,Steel Q235, galvanized and painted
Roof panel Sandwich panel or corrugated steel sheet
Sky light 6mm thick PVC
Accessories Glass cement, self-tapping screws, etc.
Edge cover 0.4mm steel sheet profile trimming
Gutter 0.4mm thick sheet steel profile or galvanized sheet
Down pie Φ110PVC
Walls Purlin C160*60*2.5,Steel Q235, painted
Wall Sandwich panel or corrugated steel plate
Accessories Glass cement, self-tapping screws, etc.
Edge cover 0.4mm steel sheet profile trimming
Ventilation Ventilation ball
Doors & windows Rolling door/sliding door PVC/alu/steel/window



Our Company and Certificates

 

Engineer Guidance on Site Installation Construction Warehouse Steel Structure Building

 
·  Professional engineers team,designed and quoted quickly.
·  Our steel structures are sold to more than 30 countries and regions.
·  30,000 square meters of self-owned factory.
·  The annual output exceeds 18000 tons of steel structures.
·  Number of active employees exceeds 100.

Our Certificates
 
Engineer Guidance on Site Installation Construction Warehouse Steel Structure Building

Project Show
Engineer Guidance on Site Installation Construction Warehouse Steel Structure Building
 
 
 
 
 
Textile Manifacturing Machine Tool Equipment Warehouse Workshop Multi-floor Building Combination
Steel Quantity 750 tons
 
 
 
 
 
 
Qingdao West High Speed Train Station Logistics Warehouse
Size 24,570 square meters
Engineer Guidance on Site Installation Construction Warehouse Steel Structure Building
 
Engineer Guidance on Site Installation Construction Warehouse Steel Structure Building
High-end Intelligent Hydraulic Machine Tool Equipment Warehouse
Size 9,702 square meters
 
Packing & Transport
 


Engineer Guidance on Site Installation Construction Warehouse Steel Structure Building


All the structure will be well packed with standard package suitable for ocean transport and loaded into 40'HQ.

All the products are loaded at the loading site of our factory using crane and forklift by our skilled workers, who will prevent the goods to be damaged.


Quality Control

QC/Technical Support
Raw material quality control 
Thickness tolerance <0.25mm
Yield and tension strength testing in-house 
Third party inspection certificate 
Supply traceable mill certificate

Structural steel fabrication quality control 
100% testing dimension tolerance <1mm
20% sample welding line ultrasonic testing, no fault, full penetration. 
20% magnetic powder testing, no bubble, no defect, Smooth and Full 
Supply third-party inspection assistance. 

Shot blasting and painting quality control 
Shot blasting grade Sa. 2.5 Metal luster, no rust, no oil dirt, no welding spatter, Roughness >75um 
Paint primer within 5 hours after shot blasting, Holiday-free coatings, smooth, No dust, Dry Film Thickness (DFT) >75UM

 

Paint primer within 5 hours after shot blasting, Holiday-free coatings, smooth, No dust, Dry Film Thickness (DFT) >75UM

Engineer Guidance on Site Installation Construction Warehouse Steel Structure Building
Engineer Guidance on Site Installation Construction Warehouse Steel Structure Building

Hot Projects
Engineer Guidance on Site Installation Construction Warehouse Steel Structure Building
Production Process

Engineer Guidance on Site Installation Construction Warehouse Steel Structure Building
How to quote

The following question we need to know before making the price. Just feel free to fill what you know.
1 Location (where will it be built?) _____country, area
2 Size: length*width*height _____mm*_____mm*_____mm
3 wind load (max. wind speed) _____kn/m2, _____km/h, _____m/s
4 snow load (max. snow height) _____kn/m2, _____mm
5 anti-earthquake _____level
6 brickwall needed or not If yes, 1.2m high or 1.5m high
7 thermal insulation If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; . if not, the metal steel sheets will be ok. The cost of the latter will be much
lower than that of the former
8 door quantity & size _____units, _____(width)mm*_____(height)mm
9 window quanity & size _____units, _____(width)mm*_____(height)mm
10 crane needed or not If yes, _____units, max. lifting weight____tons; max. lifting height _____m
 
 
FAQ

Q: You are manufacture factory or trading company?

A: We are manufacture factory. And you are welcomed to visit us at any time. The quality control flow and sales team will show you our professionalism. Also you will can get best and most competitive price after visiting us.


Q: Is your price competitive compared with other companies?

A: Our business objectives are to give the best price with same quality and best quality with the same price. We will do everything we can to reduce your cost and guarantee you get the best product that you paid for. 


Q: Can you send engineers or whole team to install my project?

A: We will give detailed installation drawings for free. We can send engineers as installation director or a team upon request.

Q: Do you accept container loading inspection?

A: You are welcomed to send an inspector, not only for the container loading, but any time during the production time.

Q: Do you offer designing service for us?

A: Yes, we could design full solution drawings as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) and etc. we can design complex industrial building like office mansion, super marker, auto dealer shop, shipping mall, 5 star hotel.


Q: What is the delivery time?

A: Delivery time depends on order quantities. In general the delivery time to nearest seaport in China will be 40 days after receiving deposit.


Q: How can you get a quotation for your projects?

A: You can contact us by email, phone, WhatsApp,Viber and so on 24*7 and you will get reply within 8 hours.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier